This loaded ore train is working down the 3 mile steep grade into Two Harbors. With the air set and lite use of dynamics, this train will ease down the grade at 20 mph into Two Harbors yard. This train was loaded at Minntac Mine near Mountain Iron, MN, and will be loaded onto a boat at Two Harbors, MN.