Posted by J. Randall Banks on March 18, 2013 
neat shot. Are the numbers above a way to tell the engineer when to start applying the break when approaching the station? The longer the train the father down the train would stop, therefore the 8 car train will stop breaking faster since it only needs to cover the start of the platform?!
- Post a Comment -