Posted by Steve Raith on October 12, 2015 
Now that's different, I've never seen where NS has remounted the old PRR signals. usally they go into the scrap pile.
Posted by CR6377 on October 12, 2015 
Conrail actually did this back in the mid 80s. The signals at MP 157 and MP 230 are the same design.
- Post a Comment -