Now that's different, I've never seen where NS has remounted the old PRR signals. usally they go into the scrap pile.
|
Posted by CR6377 on October 12, 2015 | |
Conrail actually did this back in the mid 80s. The signals at MP 157 and MP 230 are the same design.
|
|