Posted by Frank Orona on August 1, 2018 
Nice shot of the change / progress being made here. Thanks for taking this Mike!
Posted by Dale Roth on August 1, 2018 
Does anyone have a picture of this sight before the change? That is what I would like to see. Sure is a lot of work to be done
Posted by mmi16 on August 1, 2018 
Coordinated chaos!
Posted by Michael Derrick on August 1, 2018 
I don't have any of my older shots scanned (still shoot slides) so I'll borrow one from my friend Brad Kindschy. This photo shows a train on NS crossing the CSX with the movable point crossing visible. http://www.railpictures.net/photo/549706/
Posted by mmi16 on August 1, 2018 
Suspect the rebuilding of the control point will eliminate the slip switches and movable point frogs. Very high cost items of track maintenance.
Posted by Steve Larson on August 6, 2018 
Amazing how precise the work is. Fine photo, Michael.
Posted by Kerry Douglas on August 19, 2018 
Dale Roth Here what the interlock look like back in Jan 2018 http://www.railpictures.net/photo/643901/