Posted by John Russell on November 7, 2020 
Nice spot and shot. Will that electrification ever be finished? I recall seeing it much the same back in 2006!
Posted by Michael Kemp on November 8, 2020 
Hi John, I doubt it very much. It was part of a bigger project to ease the grade as it’s the 2nd steepest in NSW after Wynyard to the Harbour Bridge. There is the beginnings of a tunnel at Dombarton and on the Southern Highlands side an unfinished bridge across the Nepean River at Menangle.
Posted by John Russell on November 9, 2020 
A large viaduct and what would have been the longest tunnel excluding subways in Australia was part of that. Why didn't it get finished?
Posted by Michael Kemp on November 9, 2020 
I was always told that it was a change in State Govt. here’s the Wikipedia link that will explain things probably better than I can. https://en.m.wikipedia.org/wiki/Maldon_–_Dombarton_railway_line
- Post a Comment -