BNSF ran a 50 car grain empty across the UP Central Corridor. In this view the train heads east down the 1% grade between Soldier Summit and Kyune. Note the five BN wood chip hoppers behind the po... (more)
Amtrak's eastbound California Zephyr heads through the Kyune center siding, crossing over from main #1 to main #2 in the process. The train was running nearly five hours late making this photo ang... (more)
A trio of manned UP helpers assist in moving 84 coal loads up the 2.3% grade of Price River Canyon. UP 6711 was built by GE in Nov. 1994 as the CNW 8809.
UP 6601 and two former SP AC's lead 84 coal loads out of the gooseneck, about one mile east of Kyune.