BL26-BL27 work empty ore train 4825 past the construction of Moolarben Coal's new washing plant at Ulan,note the coal loading loop and signal behind crane.
9209-9201-9035 working hard upgrade with a loaded coal train running mainline through Wollar loop.They will crest the grade behind the camera and run downgrade through Wollar No.4 tunnel and conti... (more)