Meeting of trains on EFC. While empty ore train waits at main#02, loaded iron ore train passes by it led by two Dash 9's heading to São LuÃs 26km's away from here finishing your journey at Recei... (more)
A lonely Dash 9 leads an empty ore train passing by siding#03 heading to the Carajás Mining Complex for another shipment of iron ore in a nice summer early evening.
Empty grain train leaded by a Dash 9 and two SD40-2 waits for a meet with a loaded iron ore train to proceed to the North South Railroad for another load of grain at central area of Brazil.
Duplex of ex Ferronorte units sold to EFC at 2003. The second engine still wearing the Ferronorte paint scheme leading a loaded iron ore train slowing down for a meet at siding#56. These Dash 9's ... (more)
After a meet at Siding#56 at Km 861, this empty train heads west and up the Carajás Hill for another load of iron ore. At distance we can see the first DPU, the second and last one is not visible... (more)
A Dash 9 and a nice SD70M leads an empty ore train waiting patiently the clearance of the line at Siding#03. The engineer was relaxing inside the air conditioned cab.
Empty gondolas train just few kilometers away from your final point at Carajás Mining Complex located at the top of the Carajás Hill at Km 892 of the railroad. By this point the train already st... (more)
On a beautiful late afternoon light, this empty gondolas train heads to the mines for another round of iron ore loads at Carajás Mining Complex located at Km 892 of EFC.
Leaded by one Dash 9 and one of four Dash 8's that EFC have, that iron ore loaded train prepares to depart from siding#02. That is the last siding before the train arrives on his final point of th... (more)