The 6 push-pull trains "STP" (Stammnetzpendel/push-pull train of the main network) with railcars Be 4/4 # 511 to # 516, built in 1971/1979 by FFA and SAAS, will be all withdrawn and scra... (more)
The 6 push-pull trains "STP" (Stammnetzpendel/push-pull train of the main network) with railcars Be 4/4 # 511 to # 516, built in 1971/1979 by FFA and SAAS, will be all withdrawn and scra... (more)
The 6 push-pull trains "STP" (Stammnetzpendel/push-pull train of the main network) with railcars Be 4/4 # 511 to # 516, built in 1971/1979 by FFA and SAAS, will be all withdrawn and scra... (more)
During the night before, there were about 30 inches of snow on the Bernina pass. The overhead wire was iced and the trains couldn't run anymore. The diesel powered overhead wire maintenance and re... (more)
During the night before, there were about 30 inches of snow on the Bernina pass. The overhead wire was iced and the trains couldn't run anymore. The diesel powered overhead wire maintenance and re... (more)