In Boulenouar, PK 96 of the 652 kilometer long line through the Mauritanian desert, a work train with new concrete ties loaded arrives with GPL-15T BB # 210, built in 2008.
As morning dawns in the Mauritanian desert in Boulenouar at PK 95 at 07.18 AM, there is fog on the ground. The work train with new concrete ties and the GPL-15T CC # 210, which had arrived from No... (more)
Arrival of a work train loaded with new concrete ties from Nouadhibou in Boulenouar (PK 96) in the evening. The SNIM has a own tie production work in Nouadhibou. The train was parked overnight and... (more)