After the recent snowfall, H75 is the first train on the Cement Secondary to clear off the rails! It is seen here navigating through the snow covered trees in Lower Nazareth with a pair of GP38-2s... (more)
This days MA1 local had a little more work than usual. Before being able to deliver a boxcar to a customer on the siding, a well car with damaged containers needed to be maneuvered out of the way ... (more)
Conrail local MA1 is in the process of serving a customer on the Anacapri siding. To deliver a boxcar to the customer, they first had to move a well car with damaged containers on it. The car was ... (more)
Norfolk Southern train H66 creeps down the siding as it heads back to Allentown Terminal. The train, consisting of eight covered hoppers, is lead by GP38-2 5620. NS 5620 was built by EMD in Augu... (more)