"Shoving Sheetrock Downgrade"
On May 17th, 2024, the Creative Rail Services PABCO Gypsum Train, powered two FarmRail EMD GP10s, heads down the hill on the north end of the Fibreboard ... (more)
"Sheetrock Intermodal"
On May 17th, 2024, the Creative Rail Services PABCO Gypsum Train, powered two FarmRail EMD GP10s, starts down the hill on the north end of the Fibreboard Spur w... (more)
"Top of the Apex at Apex"
On May 17th, 2024, the Creative Rail Services PABCO Gypsum Train, powered two FarmRail EMD GP10s, pauses at the apex of the Fibreboard Spur in Apex, Nevada.... (more)
LUM55 approaches Apex as they cross over I-15 in the Nevada Desert.
Early morning at Apex found this westbound UP manifest heading down into Las Vegas.
A southbound Z train rounds the curve at Apex, just north of Las Vegas.
Returning from the Los Angeles Union Station 50th celebration. Still sporting it's old number 8444 with E9 951 and brand new SD60M 6085 the train is east of Las Vegas, after spending the night the... (more)
The Apex Local returns through Garnet on this August evening.
UP 6515 leads MWCNP east through the desert landscape east of Las Vegas.
UP SD40-2 1689 sits in a siding near Apex.
UP SD40-2 1614 sits in a siding near Apex.
The KG1LA stacker led by three Heritage locomotives rounding the Apex curve on its way to Las Vegas.
Another "monster" stacker passing through the Las Vegas area...lead by 3 members of UP's Heritage Fleet. It was almost 12,000 ft in length.
This eastbound coal empty is rounding the curve next to the main landfill for the Las Vegas area.