Prairie Line GP40-2 #1670 sits with another unidentified Geep just south of the former C&NW depot on the far western end of the UP Geneva Sub, waiting for the next crew to take the duo to work Cli... (more)
Another classic example of a customer sick and tired of the Class 1 treatment and has contracted a small time operation to do their switching. As is the case as the Saturday morning crew is busy w... (more)
The Clinton local came out at 7:30am and their 1st task was to grab some empties from ADM Ag Services along 2nd street. Here the job backs up towards their yard to begin other task for the day. By... (more)
Someday the plan is for the UP to replace this 1907 bridge across the Mississippi River with a fixed high level bridge. The new bridge will clear the 100 year foot plain by 44 feet and will widen ... (more)