Some of the excavated material from the construction of the second tunnel tube for the motorway tunnel between Göschenen and Airolo is transported by freight train to Flüelen and deposited in La... (more)
Some of the excavated material from the construction of the second tunnel tube for the motorway tunnel between Göschenen and Airolo is transported by freight train to Flüelen and deposited in La... (more)
Due to construction work in the Gotthard Base Tunnel, passenger trains were rerouted via the Gotthard mountain route from January 13 to 25, 2025 and the base tunnel was available for freight traff... (more)
Bombardier TRAXX F140 MS 186 # 497 of Railpool, rented by TR TransRail, pulls the empty excavation train 67673 from Flüelen to Airolo, through the Wattinger curve between Gurtnellen and Wassen on... (more)