Shunting locomotive Geaf 2/2 # 20606 of the Rhaetian Railway on the turntable in Landquart, in use as shunting locomotive number 4. The locomotive supplied by StadlerRail is powered by the overhea... (more)
Dual power electro/battery locomotive Geaf 2/2 # 20607 of the Rhaetian Railway entering Tiefencastel coming from Thusis, in deep snow.
The Rhaetian Railway has seven Geaf 2/2 shunting locomotives with electric and powerful battery drive, # 20601 to # 20607, delivered by StadlerRail in 2020. The maximum velocity is 80 km/h, so the... (more)
Electro/battery shunting locomotive Geaf 2/2 # 20603 of the Rhaetian Railway as shunter # 3 in Untervaz-Trimmis.
New shunter locomotive from Stadler Rail with electro and battery drive, Geaf 2/2 # 20605 of the Rhaetian Railway in Landquart. The RhB got 7 of this locomotives in 2020 to replace older, mostly d... (more)
New RhB hybrid (electro/battery) shunting locomotive Geaf 2/2 # 20607 in Untervaz-Trimmis.
Geaf 2/2 # 20601, the new hybrid electro/battery shunter of the RhB, is waiting with dining car WR # 3810 in Chur.
Brand new hybrid (electro/battery) shunting locomotive Geaf 2/2 # 20601 of the Rhaetian Railway in Chur. The RhB ordered 7 of them built by StadlerRail.
Brand new hybrid (electro/battery) shunting locomotive Geaf 2/2 # 20604 from StadlerRail for the RhB, standing in front of the depot in Landquart. The RhB ordered 7 of this vehicles, to replace ol... (more)
Brand new hybrid shunting locomotive of the Rheatian Railway built by StadlerRail in Bussnang, Geaf 2/2 # 20601, in test service in Untervaz-Trimmis, pulling "Valser" water cars. The RhB... (more)
Brand new hybrid shunting locomotive of the Rheatian Railway built by StadlerRail in Bussnang, Geaf 2/2 # 20601, in test service in Untervaz-Trimmis. The RhB ordered 7 of thise hybrid – electric... (more)