Grain train passing with speed restriction by RH54 because of a maintenance on the bridge that lies ahead.
Empty ore train headed by 1184 (Dash9W) and 1006 (Dash8) passing through the RH14.
A good place to take some pictures of the P001, you can catch the whole train after this leave Pedro Nolasco rail station at 07:00 AM.
Side view of meter gauge Dash9W that was leading a loaded coal train.
Is Always nice to see this Beauty, this model has been hard to find, in this photo we have the 812 leading the C671.
Destination Central Station Belo Horizonte a total duration of 13 hours travel.
Locomotives GE BB40-9WM 1302 and 1193 EFVM with a Ore Train at Tabual, Colatina-ES.
Full overhaul for this nice Dash 8 at heavy maintenance hangar, it's rare to see this engine without your GE 7FDL-16.
Locomotives GE BB40-9WM 1220, 1283 and 1119 EFVM with a Grain Train at Maria Ortiz, Colatina-ES.
625 maneuvering at hangar of fuel tank check area.
1146 at mechanical maintenance line, waiting for overhaul.