SY 0900 is waiting for the next shunting operation at the Anshan steel works.
Traction passenger Train of dual-engine HXD3C Electric Locomotive
SY 1037 is waiting for the next shunting operation at the Anshan steel works shed. This locomotive was kept in very good condition compared to her sisters. The chinese writing on the green front b... (more)
SY 0902 is waiting in the shadow of the blast furnaces while its slag ladles were filled.
SS80001+K237
Tiefa line The train in the movie
It is always impressive to see how the slag ladles are filled from the blast furnaces in a steel work.
A steamer of the SY class is waiting for the next shunting operation. At the Anshan steel works, the dominating color was grey. Absolutely everything was covered with dust.
A special run out of the Sandaoling open Pit coal mine with what is called the "Sparkly Train". The crew runs the steam locomotive hard on the edge of wheel slip and creates an amazing show of bur... (more)
Jing-Guang Line K535 passenger train and Ganshao Line K6521 passenger train enter Shaoguan East Station at the same time.