Before we had about two months of drought the grass and leaves were nice and green. CP #107 Montreal Lachine Intermodal Facility to Vancouver Intermodal Facility makes its way up the hill towards ... (more)
Westbound with 5 engines.
CP #107-CP 9531, 9520, 28 h/e mixed, 1 autorack, intermodal @ 16:30
CP #107-CP 5910, 59XX, 9514, 1 autorack, intermodal @ 18:35 ~ 5483ft (4449tons)
CP #107-CP 9524, 96XX, 1 h/e autorack, intermodal-376 axles @ 21:10 ~7322ft - 9 TOFC loads - makes its way through the green boreal forest at sunset.
CP #107-CEFX 1040, CP 8607, 1 h/e autoracks, intermodal-400 axles @ 20:35
CP 107 with a big eight pulls into town
CP 107 climbs the hill to Marathon
CP #107 comes out of the 35mph zone, up this hill, and is now on the approach to Marathon.
This train is on the 2nd day of its nearly six day trip to Vancouver!
Westbound approaching Loon.
CP SD9043AC 9100 leads hotshot CP #107-CP 9100, 9750, 1 h/e autorack, intermodal-380 axles @ 16:22 up the grade on the approach to Marathon. note: it looks like the bulb blew up
With the sun nearing the horizon, 107 crosses Black Bay Road.