What started of the beginning of the snow storms, was just getting started in this shot. CSX was having problems with the crossovers all up and down the RF&P.
A trio of Buckingham Branch GP16s idle away in Doswell Va. at 10:02 while awaiting their next assignments. This second round of winter storms dropped 12 to 14 inches on the area and stretched from... (more)
South bound CSX manifest train Q403 rumlbes through Doswell Va. at 14:56 with a SD70AC and CW40-8 for power. The old RF&P signals will soon fall and their replacements lay to the side ready to be ... (more)