A patched NJT E60 leads a train that has just departed Newark's Pennsylvania Station, as seen from the location of the PRR South St. Station platforms.
Two trains pass (they're both moving) with an E-60 in need of a makeover leading the southbound. Note the two guys enjoying some "tailgating" on the northbound train. No. 957 was built... (more)
The 957 clatters through Oak Interlocking on its way to Washington, DC. No. 957 was built as an E60CH (equipped with head-end power) by General Electric for Amtrak in November, 1975, and was late... (more)
The 952 is wheeling 16 cars southbound on No. 3, passing the construction site of the new Chelsea Road overpass, which is being built to eliminate the Michaelsville Road grade crossing. The consi... (more)