On ausgust 10, a northbound freight train derailed in the Gotthard Base Tunnel (GBT) and since then, both bores are closed. All passenger trains and some freights, which are able to go through the... (more)
On August 10, a northbound freight train derailed in the 57-kilometer-long Gotthard Base Tunnel, and since then both tubes have been closed. All passenger traffic, as well as freight traffic that ... (more)
On August 10, a northbound freight train derailed in the 57-kilometer-long Gotthard Base Tunnel, and since then both tubes have been closed. All passenger traffic, as well as freight traffic that ... (more)