A venerable SD70 waits its turn for the second cut of coal at Turley. NS uses six engines from Sevier Yard and three back in each half, mainly for braking.
With the closed Island Creek Coal VP#1 plant rusting away in the background, Alco #2 is slowly being reclaimed by the weeds after being cannibalized for parts. The complex is part of the massive V... (more)
A closeup of the Heartland Corridor project work. Both sides of the tunnel have been notched in anticipation of doublestacks once the project is completed. Note the test bores ringing the portal f... (more)
In the last glint of evening, a pusher crew throws the sand and begins to head east on the Pokey. The tunnel ahead has already been notched for the Heartland Corridor project.