Running a bit late secondary to the NECR rail project that will ultimately speed up the Amtrak Vermonter, Amtrak P42 103 is making track speed across the Third Branch White River in downtown Bethe... (more)
Looking down the tracks I could see the storm coming and along with it a late Amtrak 64 was thundering into the storm as I rolled down the car window and zoomed in just in time to capture what I t... (more)
The Lake Shore Limited passes a work train unloading ties in front of the old Crompton and Knowles loom works on the west side of Worcester.
Westbound 449, The Lake Shore Limited, passes through West Warren with traces of winter still lingering.
P42DC 103 is in charge of today's westbound Boston section of the Lake Shore Limited.
An iced over shuttle set sits on the pit ready for her trip to Springfield, MA.
#103 brings up the rear of the Vermonter as the train continues north to Springfield and Vermont past a CLEAr signal at 18.1-1.
This Genesis unit is pushing its short train south toward New Haven. To the left are the former servicing facilities at New Haven's Cedar Hill Yard, now used by Amtrak MOW and Providence & Worces... (more)