The Providence & Worcester Railroad's Blackstone Valley Polar Express is seen in Woonsocket, RI on the 10 am trip. ... (more)
PW NR-4 passes Packer's Pond on their way to Willimantic.
After spending a good part of the day working in Middletown, Providence & Worcester CT-1 approaches the route 150 crossing (MP-9.42) in Wallingford, as it heads back south to Cedar Hill yard.
Connecticut Color On P&W's last Halloween as an independent shortline, local CT-1 rolls north from Cedar Hill to Middletown on the old New Haven Air Line with three four-motor GEs ... (more)
P&W NR2 seen here in Waterford heading east for Groton where it will head north to Plainfield.
Main Street Niantic is the setting for this P&W train picture. This train has just finished dropping off a lumber car at Rings End and is crossing Main Street to get back to the main line. This tr... (more)
Time for lunch! Done with their morning's work, PR-2's drifting thru the Valley yard
NR-3's gathering up speed at the TAR Yard Limits on the Norwich Branch - their running past the Stragetic Recycling spur
NR2's lead power rounds its way out of the engine house lead on a sunny morning after a snow-stormy night. High winds contributed to around 0 degree temps for today's train chase.
3901 and a boxcar wait in the clear, as another unit and cut prepare to back down and pull NR2's consist out of the yard at PLAIN.
The P&W Employee Appreciation/Santa Special is seen in Worcester preparing to board passengers.
P&W's NR 2 train is seen here crossing the Thames River Bridge. This bridge is on Amtrak's Northeast Corridor and is currently being replaced.
NR-2 southbound
Providence & Worcester train NR-2 glides south along a glass-like Mill Cove in Ledyard, CT. Canon EOS 20D, Canon 70-200mm f/4L. More shots here
The conductor inspects the locomotives before the engines cross back over to Middletown.