CTrail trains normally run with three cars, but they have added a fourth for the extended Thanksgiving holiday weekend. On a sunny Wednesday morning in Meriden, train 4405 to New Haven passes un... (more)
CTrail 4405 crosses the Connecticut River on a fall morning in Enfield. This train runs from Springfield to New Haven, with its first stop in Windsor Locks.
The morning CTrail 4405 from Springfield arrives in Windsor with GP40-3H 6699 leading three Mafersa coaches. The new high-level platforms are visible, which have been installed for tracks 1 and 2.
EMD GP40-3H 6699 with its Shore Line East train set leaving Wallingford. Train from Springfield, Massachusetts to New Haven, Connecticut.
CTrail train 4405 arriving at the Windsor station with GP40-3H 6698 leading.
CTrail train 4405 crossing the Farmington River.
CTrail 4405 the 11:47am train from Springfield to New Haven, which is running a little late, departs Wallingford station.
CTrail 4405 departs from Wallingford station on the first of October.
CTrail 4405 passing through the conservation lands in Longmeadow, MA.
In Meriden, CTrail 4405 just passed under the Camp Street and Interstate 691 overpasses and will be making its scheduled 11:38am station stop, which is behind the photographer.
CTrail 4405 with GP40-3H 6696 leading, crosses the Connecticut River from Enfield into Windsor Locks.
CDOT P40DC still with its Amtrak markings. NO CDOT Patch job on this engine. Passing Windsor Locks Canal minutes away from station.
CTrail 4405 from Springfield to New Haven crosses the Connecticut River in Enfield.
CTrail 4405 in Windsor.
After its station stop 6694 pulling 3 MBB coaches past State Welding & Fabricating. Next stop State Street. Train to New Haven.