NS 7524 west splits the signals at 499.
Westbound setting off two cars that are overloaded in Mifflin yard. Notice the construction for the new bridge is under way , soon photos from bridge will be impossible.
A trio of GE's have 18A down to a crawl near Delta. A ballast train has things tied up near Swanton and 18A will eventually stop to wait for clearance.
A set of light power heads to a mine west of Ieager, through one of the tunnels that will be changed to handle double-stacks as part of the Heartland Corridor project.
Three classI Railroads in one shot!
A primer Gevo leads 21J west thru Greensburg.
An eastbound coal train eases to a stop to wait for a replacement crew before heading south.