2335 waits another turn of duty at Rockhampton locomotive yard.
4620, 4613 and 4606 (Remote) accelerate an 83 car northbound freight through Lillooet towards the Fraser River Bridge, early on Sunday morning.
3716 at BC Rail workshops compound.
QR 1724 and 1763 head a bulk sugar train east to Mackay Harbour Terminal from Marian Mill, through the picturesque Pioneer River valley, during the peak sugar cane crushing season.
QR 1154 idle behind Cloncurry Depot, waiting its next turn on a heavy haul freight on the Great Northern Railway between Mt Isa and Townsville. 31 years old, and still going strong! Then at least... (more)
QR 2353 on a southbound rail recovery train returning to Rockhampton, just leaving the southern end of Alexandra Bridge, over Fitzroy River
QR 2847 heads a northbound intermodal freight out of Rockhampton, approaching the southern end of the Alexandra Bridge over the Fitzroy River
Diesel electrics 4027, 4012 and remote mid train unit 4010 drag an export coal train east from Bluff yard on the Blackwater System, Central Line bound for the port of Gladstone, following recent h... (more)
DH 69 descends the scenic Blackbutt Range through forest between Benarkin and Linville, on the Brisbane Valley Branch, South East Queensland
QR 2483 heads ballast train back to Rockhampton through Lakes Creek, after loading at Nerimbera ballast siding on the Yeppoon Branch line
2353 about to enter northern end of Rockhampton yard with southbound rail recovery train