After a quick crew change of less than 5 minutes, UP 1988 leads 3 brand new SD70ACes out from under the famous C&S bridge over the 4-track main. This was the first revenue run for UP 8671-8673.
As an eastbound stack train finishes its climb of Archer Hill, UP 1988 crests the top of the hill near the small town of Archer, WY. The two trains have 9 combined locomotives, 5 SD70ACes and 4 SD... (more)
With an eastbound coal load crawling up the hill, BNSF 9676 is in full dynamics trying to keep its train below 20 mph as the train starts into the middle of 3 horseshoe curves, known as Upper Hors... (more)
Grinding up the 1.55% grade of Crawford Hill, BNSF 6132 east would be lucky to be going 10 mph, as two gevos pull hard on the front, and an SD70MAC and two SD70ACes shove hard on the rear.