BPRR 3887 leads RISI north.
BPRR 3885 leads SIRI south.
CSXT 1976 Conrail heads north by QR 120.
3890 leads SIRI south.
BPRR leads SIRI out of Salamanca yard.
XO2 departs Eagle Bridge following EDRJ.
B115 races out of a busy Selkirk Yard, seen in the background is M427 on the inbound flyover, and a yard set with an SD50 building a train.
The lake shore limited sits in Albany awaiting the okay south after a day and a half long rain storm wreaked havoc on the entire northeast.
WNYP runs south through Eldred
WNYP runs south at N Eldred
B741 comes into Selkirk with the NS 8099 Southern leading.
SIRI catches a morning pocket of sunlight passing Limestone.
RISI kicks up leaves rounding through the Droney horseshoe curve.
SIRI struggles up the hill at Bingham due to the morning dew and leaf oil covering the rails.