Due to a new contract with General Motors to export cars through Oxnard, the Guadalupe Hauler had 80 cars for its Oxnard set out on Monday. A decision was made to split the train into two sections... (more)
Due to a new contract with General Motors to export cars through Oxnard, the Guadalupe Hauler had 80 cars for its Oxnard set out on Monday. A decision was made to split the train into two sections... (more)
Due to a new contract with General Motors to export cars through Oxnard, the Guadalupe Hauler had 80 cars for its Oxnard set out on Monday. A decision was made to split the train into two sections... (more)
Metrolink's first evening train to Ventura East heads around the curve into one of three tunnels in Chats Rocks (Stony Point Park) behind one of the new F125 locomotives.
A Metrolink train to Moorpark California heads around the curve in Stony Point Park in Chatsworth with one of the venerable F59PHIs in as-delivered paint in charge. The tagged concrete at the bott... (more)