Train 111 moves siding to main at East Douglas.
EB stack train 223 moves siding to main departing Princeton.
Stack & rack train 285 departs Princeton on the Douglas siding.
A grain train twists through the curves and enters Princeton on the siding.
EB intermodal leaves Princeton on the Douglas siding.
EB train leaves Princeton after picking up racks from Toyota.
Not sure why there is UP power on the Francisco to DEI coal train.
EB train leaving Princeton on the main.
A string of steel and tank cars moves from siding to main at East Douglas
Loaded in, empty out. EB empty coal train 70N heads back to the mine while loaded 70T heads to PSI Energy.
Empty auto racks returning to Toyota near Princeton. The power will leave Princeton on the point of train 239.
EB intermodal moves from siding to main at East Douglas
A brand-new GE leads a short westbound consist towards the NS Princeton Terminal.
Returning to the mine at Francisco IN. The power plant that this train serves can be seen belching steam in to the cool air above the trees to the right.
Train I84 drops off empties that will be returned to TMMI near Princeton IN