Through the Baerzhan station in the open cast pit, the coaltrain with 2-8-2 JS # 8167 is accelerating for the steady 1.0 % grade up to the highest point of the line.
Full steam on the about 1.0 % grade with a 700 ton coal train out of the open cast mine of Sandaoling. Pulling is 2-8-2 JS # 8167, in the background is JS 8173 visible, waiting to go to the loadin... (more)