CLP9,12 and CLF 7 heading into Campbelltown on as sun rises on a Melbourne-brisbane freight run.
Brisbane bound freight train makes its way through Casino in the late afternoon.
Snaking around the curves.
CLP 7,12 and 42107 head out of Grafton on another interstate freight run.
CLF3 leads CLF4 and 9 into Picton on Brisbane-Melbourne trip.
CLF 3 + CLF 1 bring their train into Bargo heading north. This train was delayed by 40 mins due to a points failure at Moss Vale.
CLP12, CLP9 & CLP10 continue their journey south after crossing NT35, 7MB4 and 6MB7 at Stroud Road.
CLF4 and CLF3 head south slowly through Spring Creek, between Craven and Wards River with QRNational's No.7BM7.
CLF4 and CLF3 arrive in Stroud Road with QRNational's No.7BM7.
CLF4 and CLF3 head back south through Stroud Road with QRNational's No.7BM7.
CLF 2 and CLF 4 doing a push pull move back to the docks to make up their train to Adelaide
Locomotives and crew car exit the Bunbury Street tunnel on the approach to the yard and port area
CLF2 and crew car wait on loading to make the return trip to Adelaide with the P & O shipping train
Lead unit CLF3 is model AT26C-2M 2nd unit is ALF18 a JT26C-2M the 3rd is CLP11 a JT26C-2HM all have been rebuilt by Morrison Knudsen of Australia