Qinghai-Tibet railway has a length of 1.142 km (710 miles). All in all 960 km (595 miles) of the line is above altitude 4.000 m (12.400 feet), and 20 km (12 miles) is even above 5.000 m (15.500 fe... (more)
Qinghai-Tibet railway, km 1408 - that's 541 km (335 miles) north of Lhasa. The bridge is at altitude 5.072 m (16.640 feet) - and thereby since 2005 the highest railwaypoint anywhere in the world.
Qinghai-Tibet railway has a lenght of 1.142 km (710 miles). General Electric, Pennsylvania in USA, has delivered 78 dieselunits type C38AChe. A GE-engineer is still in Tibet to monitor the GE-loco... (more)
Freighttrafic on the Tibet railway is still minimal. The green locomotives with 3.800 HP each were built by General Electric, Pennsylvania, USA. They are fitted with the typical american horn !
North of Lhasa, the Shanghai train is on its way, still 4.300 km (2.900 miles) to go. Passengercars on the new Tibet railway has special features, such as oxygen outlet for passengers - and even a... (more)
The daily Beijing-train has just left Tibet capitol Lhasa on its 4.064 km (2.540 miles) and 47 hour journey. The highest point on the new Qinghai-Tibet railway is at 5.072 m (16.640 feet) - a new ... (more)