After waiting for a pellet train to depart and now having favorable signals themselves, IC 6252 with 118 X 2 departs the Fairlane plant and heads back to the mine at Thunderbird north to load more... (more)
Always nice to see trains being led by DMIR engines pulling DMIR ore cars on the Missabe Sub in NE Minnesota. Never mind the CN paint or the trailing Dash 8, that SD40-3 still sounded good as it ... (more)
A trio of EMD tunnel motors ( DMIR 408, BLE 903, DMIR 400) round the curve at Iron Jct. and split the signals heading south on the Missabe Sub with taconite rock from the mine for the plant.