FURX 7219 and a NS unit lead their mixed freight out of Morris, MN. Much to my disappointment the engineer forgot to turn the headlight back to bright after a meet at Morris.
BNSF rebuilt 1505 and sister EMD are working in Morris with a ballast train (note the conveyor unloading ballast). Only took about an hour to unload the whole train.