SSR102-SSR101 stabled with 4 grain wagons at Appleton Dock.
CLF2-S311-48s36-CLF4 hauling 2MC5 empty SSR grain to NSW round the curve at Albion.
Train 7MC9 empty SSR grain to NSW led by CLF2-S311-48s36-CLF4 passes stockpiled sleepers between Tottenham and Sunshine.
P16-EV120-T385 on an infrastructure evaluation run to Gippsland approaches Westall.
N465 leading a Shepparton bound service passes T386 with an SSR works train stabled near Southern Cross Station.
T386 with an SSR works train stabled in the railmotor yard near Southern Cross Station.
P16-EV120-T385 on an infrastructure evaluation run to Alamein approach Ashburton.
CLF4 leading an SSR grain train to Oaklands catches a late burst of sun on the approach to West Footscray.
CLF2-48s36-CLF4 await departure from Appleton Dock with an empty grain consist to Oaklands, NSW.
G515-VL360 with 9475 Maryvale paper train pass 48s33 stabled with six grain wagons at Appleton Dock.
48s33 stabled with six grain wagons at Appleton Dock.
P17 hauling a BGKF grain wagon and a retired Metro Comeng set destined for Bendigo approach Sunshine.
P16-T363-B75-S312 stabled with a broad gauge SSR grain consist.
CLF2-48s36-48s33-CLF4 with 4MC5 empty grain to NSW at Appleton Dock.
CLF2-48s36-48s33-CLF4 work 4MC5 empty SSR grain to NSW across the Maribyrnong River bridge in Footscray.