East bound through St. Albans with coal loads.
Building speed after a station stop in St. Albans, NKP 765 is dressed up as C&O 2765 heading east on the New River Train.
Running just minutes ahead of 2-8-4 2765, with the New River Train, the Cardinal is east bound through St. Albans heading for a station stop in Charleston.
Coming out of the fog, rounding the curve, starting down Scary hill eastbound with the Cardinal.
Taking the New River Train to Hinton, crossing the New River at Hawks Nest.
Now that is a friendly conductor. Taking loads off Coal River onto the west leg of the wye.
Moving loads from mine down Cabin Creek Branch to main line.
On the west leg of the wye of Cabin Creek Jct. heading west with loads.
Conductor Russ Miller enjoys the ride, taking loads off the Cabin Creek Branch. Yeah, and he gets paid for this!
765 puts on a show even when stopped. Picking up passengers at Charleston during the fall New River Train.
340 is in the shops for repairs after hitting a rock slide and rolling over. 340 was with 217 when it rolled (photo 69159).
6 and 7752 heading onto the west leg of the wye.
Wide cab in for repair after hitting rockslide and rolling over. Another engine, 340, was also overturned in the incident (photo 69340)
Switcher in the CSX Huntington Locomotive Shops for major repair
The last locomotive delivered letterd for the C&O waits it's turn for service at the shops.