MMID UBST's conductor climbs on a loaded lumber car for the ride back to the mainline switch. The crew needs to get this loaded car off the lead, so they can pull 2 empties out of the Snavely For... (more)
MMID 301 and 305 lead UBST on a cold Tuesday morning, as it takes the switch to leave the MDOT line for the connection track, that will ultimately lead back to the MMID mainline.