With the sun about to set three NS GP60's lead 224 west as they start their accent of Duncan Hill.
After completeing its southbound trip down the Monon SOO SD60M lead Z491 approaches the K&I bridge to cross the Ohio River into Louisville.
NS 61A struggling up Duncan Hill in the 2004 Ohio Valley Snowstorm as a crew member prepares to protect the crossing. This was the second part of a forced double of the hill in the heavy 2-3 inch ... (more)
While the east was digging out from the Blizzard of '09 all this area received was a few flurries and clouds.With the sun trying to break through, western visitors in the form of two BNSF ACe's ... (more)
Built in 1865 the now dry cleaner once turned out carriages. Today NS 112 passes the local landmark as it begins its accent of Duncan Hill as the snow begins to fall hard.
NS 27W rolls along the Ohio River Floodwall, passing the Second Baptist Church. Orignally Presbytarian and knowns as the "Town Clock Church", it served as a station on the Underground Railroad.
NS 168 leaves the Louisville Terminal and enters the Southern-East District. 168 is short and will not need helpers to climb Duncan Hill out of the Ohio River Valley.
CSX X919 makes some moves around New Albany.
CSX X919 heads south through New Albany on the former Monon while making its way toward Osborn Yard in Louisville. The train will enter NS property at K&I Junction (just beyond this scene) and cro... (more)
A southbound CSX local moves empties down New Albany's 15th St. as it heads for Osborn Yard.
Beggers can't be chosey anymore to get something moving on the Monon as a CSX GP40-2 leads a cut of empties south across 8th St. in New Albany.
Z490 heads north up the Monon with CP SD40-2 778 up front.
A Duncan Hill helper set sits on a spur track waiting for their next push assignment.
Operation Lifesaver painted NS Dash 9 9252 leads eastbound 319 at New Albany.
Southbound through New Albany on the former Monon.