A 14-minute time exposure overlooking the loop about an hour after sunset - a BNSF stack train starts at Rowen in upper right, proceeds through Woodford siding, through loop tunnel at center-right... (more)
The sound of the Cheakamus River rushing through the canyon is the only thing that can be heard for miles, that is until a northbound CN pierces the silence as it climbs upgrade. Five locomotives ... (more)
Between the 450 m long Wiesen I tunnel and the 969 m long Bärentritt tunnel on the line from Filisur to Davos, there is a gap of only few more then 10 meter, where the passengers have a glimps of... (more)
CP's fleet of SD90MACs sit idle in the yard. These units have been inactive for over a year, victims of the economic down turn. During the month of March CP began mechanical evaluations on these u... (more)