A northbound intermodal led by UP 5364 passes Bealville, CA on an April afternoon. The stain of the tunnel district takes its toll on UP's yellow, much as it did with SP power in days past.
UP 5357 is just about finished dragging this very long stack train up to the summit of Peru Hill. The grade begins at the Green River Bridge at the west end of the Green River Yard and ends 8 mile... (more)
Potash loads bound for the Crowsnest head out of Lethbridge passing the last surviving grain elevator at Fort Macleod. Not that long before the photo was taken, there were four of these “prairie... (more)