BN 6841 has a westbound intermodal outfit approaching the Cosnino Road crossing east of Flagstaff on a late winter morning on the divide. The 6841 is trailed by MRL SD40-2 252. A GP60M and SD40-2 ... (more)
CSX M652 in Mount Holly with the Seaboard Air Line Heritage Engine leading on former Seaboard Air Line rails
CPKC's Winnipeg to Toronto manifest eases down the main track at Heron Bay riding the yellows behind 118 about to accept an advance clear to stop signal indication at the east siding switch.
After the 200 mile run across the top of Lake Superior the rails turn away from the greatest of the great lakes at the west switch of Heron Bay. CP ES44AC 8948, KCS SD70ACe 4109 are on the headend... (more)
With over 15000 tons on the drawbar operating 2x1x0 it would be a slower run across the Heron Bay Subdivision for this heavy Winnipeg, Manitoba to Toronto, Ontario freight train heading across Nor... (more)
Westbound manifest train at the summit of Providence.
Westbound Z train after a lengthy MOW delay.
The California Zephyr runs past the silo at Roggen, Colorado as sunrise tries to break through the clouds on the horizon.
UPY 618 (GP15N) sorts a string of freight into the North Yard ladders in Denver, Colorado.
BNSF 1984 (SD40-2) moves into the intermodal facility to pull a cut of container cars out of the yard.
BNSF 6294 (ES44AC) waits for orders to head to the Denver Yard and a waiting train.
BNSF 2857 (GP39-2) muscles a freight towards the Broomfield Siding on the Front Range Sub.
UP 2532 & 6772 lead westbound empties.
Steam Under Wire. On Sunday, September 19, 2021, Ventura County 2 (2-6-2, Baldwin, 1922) crosses Broadway, one of several marked and controlled crossings on the Southern California Railway ... (more)