NS 22A has gotten back up to speed after a 10 mph. Slow order due to a broken rail.
CSX Q697 sits idle on the main in a full Kingsport yard and waits on a Southbound coal train to take the siding. The pipes overhead are from the Domtar Paper plant.
CSX 301 works just north of the Kingsport yard to build the rest of Q697 and head North
NS 29G awaits a crew at the yard office with a BNSF H2 Dash 9 on the point.
CSX 322 utilizes trackage rights over the NS Appalachia Division during a meet with NS 782 at Boone.
NS 782 nears a meet with a CSX trackage rights train. Shortly after the meet, 782's trailing unit went down with traction motor failure. The crew had to set off the first 20 cars and proceed with ... (more)
NS 782holds the main at Boone as it waits for a CSX trackage rights coal trian to arrive for a pass.
NS 8776 leads this long empty rack train toward a meet with NS 111 and then on West.
A short 20 car NS 38Q moves East into Bristol
A fairly busy day in the Bluefield yard as these 2 empty hopper trains sit idle
NS 85J rolls through Ada on its way to the Bluefield yard
NS 147 arrives in the Bluefield yard with a long manifest train.
CSX 4701 leads loaded coal train U736 through the Big Bend Tunnel just minutes after the Amtrak Cardinal blew through Talcott Eastbound.
WVC 67 comes around a curve just North of the Elkins Depot enroute to Tygart Junction
Former Clinchfield F7A sits at the Depot at Elkins ready to take passengers to Tygart Junction