A pair of GP9s under going load testing at the CP Diesel Facility
An ES44AC and its older AC4400 brother are lined up to get fuel.
While loaded barges wait transport down river, this CEFX led CP train heads westbound along the river. Only a little bit of color remains this all to short fall season.
A lone unit sits among some blooming flowers waiting for action.
Birds got late warning of this vehicle train as it approached. I barely got ahead of it for this shot.
A look through the trees at CP and Soo EMD power.
The colors of the locomotive match the trees and grass.
A filthy dash-9 is on point rather than one of the other three clean ones behind it.
Stretching down the hill on the Midway sub BNSF 803, 7916 and 537 work towards Galesburg.
Track work at Park Jct diverts all traffic to one main.
The CP's "Transfer One" is nearly lost in the steam.
The 261 returning home past the bluffs
Heading to South St. Paul from East Minneapolis.
Crawling into Midway with BNSF 7769, BNSF 5033, CSXT 8087 and CSXT 8757.
A car man assists in switching the yard, the Z-SSECHC sneaks up the middle, and a stack train advances for a reverse into the yard.