Today, the old lady (the Mallet has been built in 1898), has hauled the HSB Nostalgie Zug from Wernigerode up to the Brocken summit. Now it is back in the shed and is taking a well deserved rest.
HSB Mallet 99 5902 is taking a rest at the Brocken station. It arrived at the summit a few minutes ago with the "Nostalgie Zug" from Wernigerode. The locomotive has been built by Arnold Jung in 18... (more)
The only tunnel of the Harz system (the length of the total narrow gauge system is 140 km) is located half way between Wernigerode and Drei Annen Hohne. There is nothing better than a good walk of... (more)
This is certainly one of the most popular spots on the Harz system. Just after having left the Wernigerode Kirchstrasse station (now called Wernigerode Hochschule Harz station), the train is runni... (more)