BLE 902, 901 and 866 pull 48 loads of Minnesota ore into North Bessemer yard where it will be interchanged with the Union railroad, it will then be taken down to the furnace's at the USS Edgar Tho... (more)
After crossing the massive bridge over the Allegheny river the engineer on 902 drops sand and notches up as the train continues south to North Bessemer where they will interchange with the Union R... (more)
902 South runs past the wye to the former Hilliards Branch. The wye still remains, but the branch was removed a few years ago, and the branch's only customer, J.S. McCormick Co., transloads I be... (more)
If I could go back in time, standing in this same spot would yield many photo opportunities as the Bessemer still uses their High Line (featured) to by-pass Greenville, and their Low Line, which i... (more)