A Copper Basin Railway OT-1 loaded with 6,000 tons of copper oxide ore battles the short hill that leads to ASARCO's smelter.
Symbol OT-1, with 6,000 tons of copper ore bound for the smelter, rolls through several cuts and prepares to enter tunnel 3 on this former SP branch.
Copper Basin Railway train OT-1 departs Ray Junction and tunnel 2 on its way to ASARCO's smelter at Hayden.
Copper Basin Railway's OT1, fresh from ASARCO's Ray mine with 60 loads of ore, approaches the railroad's headquarters at Hayden.
A Copper Basin Railway OT1, loaded with copper ore from ASARCO's Ray mine, approaches Ray Junction with the huge mountains of mine tailings looking in the distance.
Copper Basin Railway train OT1 passes through Ray Jct. with a loaded train of copper ore.
Copper Basin Railway train OT1, with 60 loaded hoppers of copper ore, approaches tunnel 3.