The Proctor road switch rolls down hill with a load of Ore for dock 6 in Duluth behind a quad of SD40U's. This photo was recently made possible by the construction of a new bridge just south of Pr... (more)
After bringing the loads down the hill from Proctor, the crew prepares to shove them out on dock 6 for unloading. They will be added to the huge pile on the ground already there from winter stockp... (more)