HXD1C traction track Engineering vehicle passes through Huanggang Railway Station
The CRH380AJ-0202 high-speed railway comprehensive inspection vehicle carries out the detection of the Wuhan-Guangzhou high-speed railway line.
Traction passenger Train of dual-engine HXD3C Electric Locomotive
Jing-Guang Line K535 passenger train and Ganshao Line K6521 passenger train enter Shaoguan East Station at the same time.
The Z201 passenger train originally towed by the SS9G electric locomotive was temporarily replaced by the SS8 electric locomotive traction. Due to the failure of the SS9G electric locomotive in Ch... (more)
K935 passenger train approaching Shaoguan East Station.
HXD1C freight electric locomotive out of storage, go to Shaoguan East Station to carry out the task of traction freight train.
K775 passenger trains close to ShaoGuan East Railway Station.
Passenger train K6531 approaching Shaoguan East Station.
Mid-Autumn Festival temporary passenger train passes Huanglangshui Bridge on Ganshao Railway,The Huanglangshui Bridge is the only bridge built according to the double track standard on the Ganshao... (more)
Passenger train entering Jingguang line
Passenger train K755 (Luoyang - Guangzhou) enters Shaoguan East Railway Station
Outbound passenger trains Z99 times (Shanghai - Hung Hom) pass ShaoGuan East Railway Station
Passenger train enters Gan Shao line
Passenger trains enter the Beijing Guangzhou line